Somos una empresa especializada en servicios de Ingeniería, Procura y Construcción para la Industria Petrolera y Gasífera
Interior Solutions Owner & Co-Owner
Leaders in comprehensive onshore and offshore infrastructure solutions
Supply and laying of flexible pipe
CAMSA's Flexible Pipe Supply and Laying Business Unit is oriented toward providing comprehensive solutions for the supply, mobilization, installation, laying, connection, and commissioning of flexible pipe systems primarily intended for fluid production, transport, and handling operations in the Oil and Gas industry.
Our unit specializes in the execution of projects associated with the use of high-strength flexible pipe, including Flexsteel solutions, for onshore, lacustrine, and other facilities where a technical, safe, and efficient alternative to conventional rigid piping systems is required.
CAMSA integrates engineering, procurement, logistics, lifting, transport, installation, and field execution capabilities, enabling the development of projects under a comprehensive and coordinated service concept.
Scope of Services:
The Business Unit provides services that include, among others:
- Supply of flexible pipe for Oil & Gas applications.
- Supply of accessories, connections, fittings, components, and complementary materials.
- Engineering and planning of installation activities.
- Inspection and preparation of piping prior to installation.
- Land transport of flexible pipe and associated components.
- Loading and unloading operations using lifting equipment.
- Storage and specialized handling of flexible pipe.
- Transport and staging of flexible pipe to installation sites.
- Installation and laying of flexible pipe.
- Pipelaying via barges and specialized vessels.
- Operations using Self-Propelled Barges, as required by project conditions.
- Operations with connection boats and dive boats.
- Connection of pipe sections and associated components.
- Piping system installation in lake facilities.
- Inspection, testing, and verification of completed installations.
- Technical support during field commissioning.
- Maintenance and repair of flexible piping systems.
- Technical and HSE supervision during work execution.
Engineering
- Conceptual, basic and detailed engineering.
- Structural, mechanical, electrical and instrumentation design.
- Feasibility studies and project optimization.
- Project management and comprehensive planning.
Procurement and Supply
- Management of national and international purchases.
- Supply of specialized equipment and materials.
- Logistics control and quality assurance of suppliers.
- Inventory and supply chain management.
Construction
- Civil works: earthworks, foundations, industrial buildings and infrastructure works.
- Mechanical assembly: pipes, process equipment, tanks and metal structures.
- Electrical works and instrumentation: substations, power lines, control and automation systems.
- Offshore projects: support for offshore installations, maintenance and specialized construction.
Comprehensive Project Management
- IPC/EPC Administration.
- Cost control and schedule.
- Quality assurance and control.
- HSE (Health, Safety and Environment) supervision.
- Commissioning and post-construction support.
- Pile Manufacturing and Installation (Onshore and Offshore).
- Construction and Maintenance of Docks, Berths, Bridges, Docks, Platforms.
- Pipeline Laying, Gas Pipelines and Oil Pipelines.
- Construction and Maintenance of Offshore Facilities.
- Construction and Maintenance of Compression Plants, Water Injection, Flow Stations.
- Lifting and Transfer of Heavy Equipment.
Lake Teams
Líderes en soluciones integrales de infraestructura costa afuera y costa adentro
Hammer for driving piles up to 82" in diameter
| TECNICAL DATA D100-13 | |
|---|---|
| Max, rope diameter for deflector, sheave of tripping device (* reeve twice) | 30° |
| Weight | |
| Tripping device | 750 |
| Diesel Pile Hammer | 20.720 |
| Max, inclined pile driving, without / with extension | 1:5 / 1:2 |
Líderes en soluciones integrales de infraestructura costa afuera y costa adentro
Kara Sea tugboat
| Characteristics | |
|---|---|
| Main Engines: Auxiliary Engines: | 2 GENERAL MOTORS CORP 1,223 KW each. 2 DETROIT DIESEL 60KW EACH |
| Service: | Trailer |
| Construction: | It dates from 1973 in Houma, Louisiana, USA |
| Arching: | Initial inventory was conducted on April 2, 1974, in New Orleans, Louisiana, USA. Last inventory date: April 2, 2016. |
| Inspections: | Last inspection of the ship's underwater structure, carried out in 2012 according to the Construction Safety Certificate for Cargo Ships, issued by INEA. |
| Record: | Venezuelan Flag (2016) |
| Fuel Capacity: | 174.680 Lts |
| Navigation Speed: | 11 Knots |
| Draft: | 3,75 mt |
| Minimum staffing: | 6 people |
| Main Dimensions | |
|---|---|
| Length | 32,50 mt |
| Sleeve | 9,50 mt |
| Strut | 4,75 mt |
| Draft | 3,75 mt |
| Gross Tonnage (GT) | |
|---|---|
| Rough | 319,00 Ton |
| Net | 95,00 Ton |
| DECK EQUIPMENT | |
|---|---|
| Crane | LINK BELT |
| Model | LS-248 |
| Capacity | 180 TON |
| Pen reach | 50,0 Mt |
| TOWING AND ANCHOR HANDLING | |
| Winche | AMERICAN HOIST & DERRICK |
| Model | GM 671 DIESEL |
| Shooting force | 110 Ton |
| Reel Capacity | 4 TAMBORES |
| Anchors | DELTA FLIPPER (4) 5 Ton |
Líderes en soluciones integrales de infraestructura costa afuera y costa adentro
Gabarra CB-2282
| RECORD | |
|---|---|
| Type of Vessel | Barge crane and deck loading Offshore |
| Builder | MISENER INDUSTRIES, INC |
| Year of Construction | 1.982 |
| No. of Casco / Last entry to Dike | 180 / JULY 2016 |
| Port of Registry / Flag | MARACAIBO / VENEZUELA |
| Owner | CAMSA CA Construction Company |
| Gross Tonnage | 2.100 |
| Net Tonnage | 630 |
| DIMENSIONS | |
| Overall Length (L.O.A.) | 76,20 mt |
| Sleeve | 21.95 mt |
| Strut | 4,88 mt |
| Maximum Draft | 3,90 mt |
| Minimum Draft | 0,70 mt |
| Freeboard | 1,00 mt |
| Displacement towards load line | 6.801,04 mt |
| Open space on cargo deck | 70,1 mt X 20,7 mt |
| Hull and Superstructure Material | NAVAL STEEL |
| CAPABILITIES | |
| Loading deck | 4.487,0 TM |
| Water (Ballast) | 17.280.000,00 Lts |
| Fuel | 77.200,00 Lts |
| Drinking water | 38.640,00 Lts |
Líderes en soluciones integrales de infraestructura costa afuera y costa adentro
Hammer for driving piles up to 82" in diameter
| TECNICAL DATA D 100-13 | |
|---|---|
| Impact weight (pistón) | 100.000 |
| Energy per blow | 360 – 214 |
| Number of blows | 35 – 45 |
| Suitable for driving piles (depending on soil and pile) | 7.100 |
| Consumption | |
| Diesel Oil | 30,0 |
| Lubricant | 2,6 |
| Tank Capacity – Diesel Oil Tank | 155,0 |
| Tank Capacity – Lube Tank | 32,00 |
Líderes en soluciones integrales de infraestructura costa afuera y costa adentro
Heavy Equipment Field
| TYPE | UNIT | QUANTITY |
|---|---|---|
| PIPELAYER | SIDE BOOM | 16 |
| BULLDOZER | TRACTOR | 4 |
| TRACKED TRACTOR | TRACTOR WELDING MACHINE | 5 |
| HYDRAULIC TRACKED EXCAVATOR (KOMATSU) | JUMBO | 8 |
| BACKHOE LOADER | BACKHOE | 6 |
| WHEEL LOADER | PAYLOADER | 4 |
| PIPE BENDING MACHINE | 30″ 42″ BENDING MACHINE | 2 |
| PIPE BENDING MACHINE | 8″ 24″ BENDING MACHINE | 2 |
| ROUGH TERRAIN CRANE | 25 TON CRANE | 2 |
| ALL-TERRAIN CRANE (CAPACITY: 40 TONS) | 45 TON CRANE | 2 |
| ROUGH TERRAIN CRANE | 50 TON CRANE | 2 |
| MOTOR GRADER | PATROL | 3 |
| TRACK LOADER | CHOVER | 2 |
Operational Capacity
Our infrastructure across western and eastern Venezuela allows us to mobilize resources, equipment, and specialized personnel with speed and efficiency. This strategic presence strengthens our capacity to execute simultaneous projects and support operations in different regions of the country, including offshore environments.
Interior Solutions Owner & Co-Owner
Commitment to Energy Development
CAMSA Company positions itself as the premier solution for executing projects that drive the effective and efficient growth of the Venezuelan energy sector. Our commitment is to deliver value to every project through innovation, operational discipline, and a long-term vision focused on the sustainable development of the country.